Details posts

The Prime Minister calls for overcapacity report

The Vietnamese Prime Minister Nguyen Xuan Phuc has asked the Ministry of Construction and VICEM to report on the country’s excess cement capacity, which is set to reach 25-36Mt/yr by 2020.

The latest statistics from the Ministry of Construction’s Building Material Department show that cement consumption was approximately 45Mt in the first half of 2018, a rise of 30% year-on-year compared to the same period of 2017, and more than 50% of the year’s plan.

The sector’s capacity is 110Mt/yr, including the volume from plants expected to be built in 2018. Aside from that, existing plants have kept improving technology so their production capacity might reach 120-130Mt/yr by 2020.

Three large projects with the total capacity of 10Mt/yr were put into operation in the past 12 months. In 2019 many more projects are expected to come into operation, with a total new capacity of 12Mt/yr coming online.

Published by Global Cement News at 26/11/2018

Updated by Cost Solutions

Hotline tư vấn miễn phí: +84973511868
zalo
news_detail-news